Purification Line for Arsenic-Bearing Germanium Feed from Fly Ash

This delivered line processes arsenic-bearing germanium feed from fly ash for a rare-metal processor in central China. It recovers a germanium product from arsenic-bearing fly ash, with AsCl3 / FeCl3 separated. Explore arsenic removal germanium for the wider purification scope.

Central ChinaDelivered 202610 t/d fly ash

Arsenic-bearing germanium feed: Project Overview

Customer
a rare-metal processor in central China
Feed
arsenic-bearing fly ash
Product
germanium product from arsenic-bearing fly ash, with AsCl3 / FeCl3 separated
Scale
10 t/d fly ash
Delivery
2026 · delivered
AI-generated generic process equipment concept; not a delivered germanium installation
AI-generated equipment concept — not a photograph or reconstruction of this delivered line.

The Challenge

The fly ash contained arsenic. After chlorination, arsenic and germanium enter the chloride system, so the purification duty needs a dedicated de-arsenic rectification section. AsCl3 and FeCl3 are separated from the germanium-bearing stream.

At 10 t/d fly ash, the equipment scope needed to address arsenic separation together with germanium recovery. Containment of the arsenic-bearing material and the chloride-separation duty needed to be considered together within the dedicated purification section.

Process Route

The line combines the following unit operations:

Chlorination and separation — rectification — de-arsenic rectification — hydrolysis — vacuum drying

The de-arsenic section follows rectification and precedes hydrolysis. A chlorination reactor serves the chlorination duty. The separate de-arsenic rectification stage distinguishes this scope from the arsenic-free reference.

Scope of Supply

The delivered scope comprises line equipment and PLC electrical control, covering the process sections identified above. The equipment agreement defines the supplied items and the connections to site services.

Installation and commissioning are covered by a separate service contract after the order.

Equipment and Materials

The equipment schedule below identifies the supplied equipment and quantities. Materials of construction are selected for the material processed. The schedule should be read together with the agreed scope of supply, rather than as a universal configuration for another feed.

On a narrow screen, scroll the equipment table sideways.

EquipmentQty
Weighing bucket elevator1
Feed hopper / silo1
High-temperature chlorination reaction-separation furnace (induction heated)1
Screw conveyor1
1st/2nd-stage coil heat exchangers (chlorination section)2
Water-jet vacuum unit2
Chlorination reaction-rectification still2
Bag filter press-dryer4
Coil condenser / solvent recovery condenser4
De-arsenic reaction-rectification still1
Low-temperature chiller unit1
Hydrolysis reactor2
Multifunction vacuum dryer1
Mobile material trough3
Screw metering feeder1
High-temperature hydrogen reduction furnace1
Screw discharge conveyor1
1st/2nd-stage coil heat exchangers (reduction section)2
High-pressure blower1
Thermal-oil heating unit1
Nitrogen generator1
Air compressor1
Closed-circuit cooling tower1
Transfer pumps (feed, HCl, residue, filtrate, reaction liquor, condensate, DI water, cooling water)×14
PLC electrical control cabinet1

Results

10t/d fly ash

The line was delivered for 10 t/d of arsenic-bearing fly ash. The product is germanium product from arsenic-bearing fly ash, with AsCl3 / FeCl3 separated. The scope includes PLC electrical control and the dedicated de-arsenic rectification section.

The feed duty and chloride-separation requirement define this reference. A new project needs its own material analysis and product specification before the equipment scope can be matched.

FAQ

Why does an arsenic-bearing feed need a separate rectification step?

Arsenic enters the chloride system with germanium after chlorination. This line includes dedicated de-arsenic rectification after rectification and before hydrolysis.

Which by-product chlorides are separated on this line?

The delivered reference identifies AsCl3 and FeCl3 as separated chlorides.

How does this line differ from an arsenic-free fly ash line?

This 10 t/d arsenic-bearing fly-ash line adds a dedicated de-arsenic rectification section. The arsenic-free reference has a separate feed duty and does not require that section.