Vimfun Rare Metal Extraction
Menu

DELIVERED LINE · ARSENIC-FREE FEED

Germanium Purification Line for Arsenic-Free Fly Ash

This germanium purification line was delivered to a rare-metal processor in central China to recover a germanium product from arsenic-free fly ash. Explore germanium recovery plant equipment for the wider recovery scope.

Central ChinaDelivered 202635 t/d fly ash

Germanium purification line: Project Overview

Customer
a rare-metal processor in central China
Feed
arsenic-free fly ash
Product
germanium product from fly ash
Scale
35 t/d fly ash
Delivery
2026 · delivered
AI-generated generic process equipment concept; not a delivered germanium installation
AI-generated equipment concept — not a photograph or reconstruction of this delivered line.

The Challenge

The feed was low-grade germanium-bearing fly ash, with a throughput of 35 t/d. The chlorination and separation section needed to transfer germanium into the recoverable process stream. This feed was arsenic-free and did not require a dedicated de-arsenic stage.

The general equipment challenges include sustained operation at the stated feed duty, materials suited to chloride media, and matching the rectification, filtration and condensation-recovery sections. Matching these sections is part of defining a connected equipment package. The materials selected for each item need to suit the media it handles.

Process Route

The line combines the following unit operations:

Chlorination and separation — rectification — filtration — condensation recovery — hydrolysis — vacuum drying

The chlorination reactor addresses the chlorination section. Rectification, filtration and condensation recovery are part of the equipment package before hydrolysis and vacuum drying.

Scope of Supply

The delivered scope comprises line equipment and PLC electrical control, covering the process sections identified above. The equipment agreement defines the supplied items and the connections to site services.

Installation and commissioning are covered by a separate service contract after the order.

Equipment and Materials

The equipment schedule below identifies the supplied equipment and quantities. Materials of construction are selected for the material processed. The schedule should be read together with the agreed scope of supply, rather than as a universal configuration for another feed.

On a narrow screen, scroll the equipment table sideways.

EquipmentQty
Weighing bucket elevator1
Feed hopper / silo1
High-temperature chlorination reaction-separation furnace (induction heated)1
Screw conveyor1
1st/2nd-stage coil heat exchangers (chlorination section)2
Water-jet vacuum unit2
Chlorination reaction-rectification still2
Bag filter press-dryer4
Coil condenser / solvent recovery condenser4
Reaction-rectification still1
Low-temperature chiller unit1
Hydrolysis reactor2
Multifunction vacuum dryer2
Mobile material trough3
Screw metering feeder1
High-temperature hydrogen reduction furnace1
Screw discharge conveyor1
1st/2nd-stage coil heat exchangers (reduction section)2
High-pressure blower1
Thermal-oil heating unit1
Nitrogen generator1
Air compressor1
Closed-circuit cooling tower1
Transfer pumps (feed, HCl, residue, filtrate, reaction liquor, condensate, DI water, cooling water)×16
PLC electrical control cabinet1

Results

35t/d fly ash

The line was delivered for 35 t/d of arsenic-free fly ash, producing a germanium product from fly ash. The supplied equipment covers chlorination and separation through vacuum drying, with PLC electrical control.

The scale is the incoming fly-ash basis. It should not be read as germanium output or transferred to a different feed without defining the material and product requirements.

FAQ

What daily fly ash capacity was this line built for?

The line was delivered for 35 t/d of arsenic-free fly ash. This is the incoming feed basis.

Does an arsenic-free feed need a de-arsenic step?

This arsenic-free fly-ash reference does not include a dedicated de-arsenic stage.

Which unit operations are included from chlorination to drying?

Chlorination and separation, rectification, filtration, condensation recovery, hydrolysis and vacuum drying are the listed unit operations.

DISCUSS A SIMILAR FEED

Send us your feed material and target product, and we will propose a process route and scope of supply.

Discuss your feed ↗